Calcuta Calcuta
Customs Customs

Russia plans Transsib and BAM capacity of 270 million tons by 2032

Russia plans to raise Transsib and BAM capacity to 270 million tons by end-2032, with an intermediate target of 210 million tons by 2030; capacity was 173 million tons in 2023 and 180 million tons in 2024.

1 min read Source: Import to Russia (Telegram)

Russia plans to increase the capacity of the Trans-Siberian and Baikal-Amur Mainline to 270 million tons by the end of 2032, with an intermediate target of 210 million tons by 2030.

According to Deputy Prime Minister Vitaly Savelyev, in 2023 the capacity of the Eastern Polygon was 173 million tons, in 2024 — 180 million tons. The third stage of modernization covers 24 sections: 12 on the Trans-Siberian, 10 on the BAM and two connecting lines.

In parallel, the North-South corridor is being developed, cross-border procedures are being simplified, and the focus is on dry ports.

However, growth in carriage capacity alone does not guarantee faster delivery, since bottlenecks may shift to the junctions with port and border infrastructure. The effect will show only with synchronized operation of the entire chain.

Who it affects: shippers, carriers, customs representatives, dry port operators, and importers. For calculating delivery times it is important to know that acceleration depends not only on the capacity of the mainlines, but also on the capacity of approaches to the Far Eastern ports, border crossing points and terminals.

Source: Import to Russia (Telegram)

← All posts

Report a bug
Report a bug

You can submit a bug report after registration — that way we can clarify the details and let you know when it is fixed.