In early 2027 a pontoon crossing through the Dzhalinda checkpoint is planned to open in test mode in the Amur Region. The crossing worked until the mid-2000s but was mothballed because of low cargo traffic; in winter an ice crossing was used, in summer ferries. The first stage is a multimodal scheme: cargo goes by rail to Skovorodino station, is then transshipped to trucks and driven to the border; after the Skovorodino-Reinovo line is repaired, the rail leg will be extended closer to the crossing.
In the longer term a combined road-and-rail bridge Dzhalinda-Mohe with two checkpoints is planned, possibly in the first half of the 2030s. The project will become part of the Mohe-Nayba corridor: it should cut the distance of shipments from Yakutia to China by almost 2,000 km and give China a land exit to the Northern Sea Route; this requires building about 1,300 km of railway from Nizhny Bestyakh to the future Arctic port of Nayba. The timeline for the whole corridor is not yet defined.
Who it affects: shippers from Yakutia and the Amur Region looking for a short route to China, and logistics companies planning routes in the Far East.