Calcuta Calcuta
Logistics Logistics

Vysotsky grain terminal included in checkpoint boundaries

The plot with the under-construction Vysotsky grain terminal was included in the sea checkpoint boundaries at Vysotsk port.

1 min read Source: CentrVED

The plot with the under-construction Vysotsky grain terminal has been included in the boundaries of the sea checkpoint at the port of Vysotsk, which is an important step.

Port and border facilities as well as railway infrastructure are being built on the site to ensure logistics.

Works are planned to be completed in 2027, after which the terminal will start operating.

The project is implemented by Tekhnotrans, and the terminal's stated capacity is 4 million tonnes of grain per year.

Own transshipment should reduce the company's dependence on third-party port facilities, which is strategically important, especially in season.

Inclusion in the checkpoint boundaries means grain can be cleared on site, without additional procedures, which will speed up export.

The terminal will become part of Vysotsk's port infrastructure and allow the company to control the entire transshipment chain from reception to loading onto ships.

This is especially important during harvest season, when port capacity is overloaded and own transshipment gives an advantage.

What it means for your calculation

There is no direct effect on duties, but the new terminal will increase grain transshipment capacity and reduce dependence on third-party ports.

Source: CentrVED

← All posts

Report a bug
Report a bug

You can submit a bug report after registration — that way we can clarify the details and let you know when it is fixed.