How to structure payments for equipment from China

It is more effective to structure payments tied to documents and inspection results: the 30/70 scheme and control conditions in the contract.

2 min read Source: Shanghai LEO

For equipment supply projects from China it is more effective to structure payments tied to specific documents and inspection results: such a system reduces risks of defects, incomplete sets and shipment delays. The basic benchmark is the 30/70 scheme — 30% advance and 70% on readiness before shipment from the factory. For non-standard equipment the payment schedule can be stepped.

Each payment must be tied to an event and a document confirming it: an inspection report, a copy of the bill of lading, photos of the finished batch. If the payment term is not recorded in the contract, the 1980 Vienna Convention usually applies to a Russian buyer's deal with a Chinese seller, which both Russia and China signed. Under Article 58 the buyer pays when the seller has provided the goods or shipping documents, and is not obliged to pay until able to inspect the goods. The 30/70 condition replaces this general order with its own, so it is recorded in the contract and proforma verbatim.

The final payment should be tied not only to the production date but to fulfilment of control conditions: factory tests, elimination of identified remarks, independent inspection, confirmation of completeness and marking, invoice, packing list, photo and video report, approval of shipping documents. Fix these conditions in the contract to gain real leverage over the factory.

Special attention to the balance against a copy of the bill of lading. Balance against a B/L copy proves shipment but not contents: the supplier may ship something different from what was ordered. Pre-shipment inspection as a payment trigger solves this: pay the balance only against a clean inspection report from a third party.

Practical recommendations: check the supplier's legal entity before the first payment, reconcile three points — the legal entity in the contract, in the invoice and the payment recipient, record the payment scheme in the contract, tie the balance to a fact, start with a test order for a small amount, formalise any condition change by an addendum. For a long cycle and large amount use stages 30/40/30.

An additional lever is a clause on advance refund: if the supplier fails to provide proof of raw material purchase within seven business days, photos of steel cutting within fourteen business days, or fails to start assembly within twenty-one business days, the buyer may demand a refund of the advance within five business days. In practice, suppliers refund the advance in about 60% of such cases when the clause is clearly written.