President Vladimir Putin published a list of instructions following his working trip to Vladivostok on 2–3 September 2026. Two of them concern construction of an automobile checkpoint on Bolshoy Ussuriysky Island on the border with China: the government and Khabarovsk Krai are instructed to speed up construction, and the Prosecutor General's Office (Генпрокуратура) is to check compliance with the law during construction. The report by Prosecutor General Alexander Gutsan is due by 25 December 2026 (RIA Novosti).
The checkpoint is planned to open in 2028. Projected throughput is up to 1.3 million tonnes a year, passenger flow about 1.4 million people. Readiness of the access road to the bridge across the Amur channel is 67% by technical assessment, 70% by construction assessment. The embankment under the checkpoint is already built; work to adjust the project documentation is finishing, after which construction of the infrastructure will begin. Modular structures will be installed in 2027 to assess traffic, and full construction will take 14 months — the deadline Rosgranstroy set for the facility (Interfax).
Bolshoy Ussuriysky Island, 254 sq km, is divided between Russia (174 sq km) and China (80 sq km) after the 2008 demarcation. The checkpoint "Bolshoy Ussuriysky — Heixiazi" will become a multilateral freight-and-passenger crossing; it will be synchronised with cross-border cooperation projects: a branch of the National Centre "Russia", the Friendship Park of Peoples and a Russian-Chinese technopark on 4.2 ha.
For importers and carriers the new crossing means an additional route to China from the Far East. Delivery times and costs through it will become clear after commissioning; until then logistics through Khabarovsk Krai keeps its current capacity.